General Engineering Services  - Temple Terrace, Florida

View of telecom parkway new road with bike lanes and sidewalks

Cardno has been providing a variety of general engineering services to City for more than 14 years.

Cardno provides a host of general engineering and surveying services to the City of Temple Terrace including: 

  • water / wastewater design 
  • utility relocation and coordination 
  • master planning  
  • permitting  
  • construction management 
  • groundwater 
  • water modeling 
  • CIP budgets 
  • GIS and asset management 
  • right-of-way services 
  • surveying 
  • subsurface utility engineering. 

Representative project experience includes: 

  • I-75 Utility Relocation / Fowler Avenue – design of a subaqueous relocation of 1,000 feet of 12-inch fusible PVC sanitary sewer force main along SR 582 (Fowler Avenue) beneath the Hillsborough River by HDD 
  • Chinaberry Water Pumping Station Improvements – rehabilitation of booster pump station (PS) including two 60 hp booster pumps, piping, flow meter, emergency generator, VFDs, controls, and building improvements 
  • Grandview Drive Water Main Replacement – design of 3,800 feet of water main and associated service connections within City ROW to replace aging rear lot service meters and galvanized water lines   
  • 10-Year Water Master Plan and Update – population and water demand projections, GIS data verification and import for development, calibration and analysis of hydraulic model utilized for 10-year road map of water system improvements with estimated costs   
  • Pump stations “SA” and “E” rehabilitation – conversion to submersible type station with modifications to dry-pit and wet-pit areas, installation of submersible pumps, piping, controls, and emergency generator  
  • 127th Ave (Telecom Pkwy) Extension – design, permitting, bidding, and CEI for 1,800 LF 12” diameter PVC force main.