Client
|
Project
|
Description
|
|
Alcoa Hatch Engieering Alliance
|
Alcoa Pinjarra Expansion - Calciner Project
|
Design and documentation of entire structure, consisting approx 1000t of steel.
|
|
BHP Billiton DRI
|
Port Hedland Furnace - FU411 Rebuild - Convection Coil Installation Frames.
|
Design audit of installation frames for critical installation of convection coils
into operating plant.
|
|
Clough
|
Boroo Gold Project Mongolia
|
Design audit for the leach and absorption areas.
|
|
Calibre Projects
|
HI Yandi 36Mtpa - tertiary crusher structure.
|
Design of the tertiary crushing sructure, including bins, bin support structure
and general equipment support.
|
|
Como Engineers
|
Megellan Lead Project WA Feasibility Study.
|
Preliminary design for civil/structural works as part of bankable feasibility study.
|
|
DRA Pacific - Project Manager
|
Ashton Mining - Merlin Project - Scrubber Vibration.
|
Design of all civil works, concrete foundations and structural steelwork.
|
|
DRA Pacific
|
Ashton mining - Merlin Project - Scrubber Vibration.
|
Site investigation of remedial works to overcome severe vibration problems with
elevated chain driven scrubber, designed by others.
|
|
Fleetwood Portables
|
Woodside Phase 4 Expansions - Temporary Site Admin Offices Karratha
|
Design of two level steel frame structure and transportable buildings for site office
accommodation.
|
|
Fluor
|
Batu Hijau Mine site for Newmont Indonesia.
|
Design of all building works foundations and structural steelwork for the new heavy
vehicle workshop - 300t vehicles and 2 no.35t SWL EOHT cranes, electrical workship
and warehouse.
|
|
FEA
|
Woodside Energy - North Rankin A Platform - Control Skid.
|
Design of stainless steel closed cabinet and skid structure for installation offshore.
Design included consideration of cyclonic, lofting loads and sea transport loads.
|
|
GCD International
|
Woodside Phase 4 Expansion - Chimney stacks - Karratha
|
Structural design, fabrication support, transportation analysis and lifting analysis
and design of 3 steel chimney stakcs of 40 metres height and ranging in diameter
from 3.6 metres to 6.3 metres.
|
|
GDC International
|
Woodside Phase 4 Expansion - Thermal Combustion Unit - Karratha.
|
Structural design, fabrication support, transportation analysis and lifting analysis
and design for a 40m high, 4 metre diameter TCU operating at a temperature of 1000
degrees celcius. Responsibilities incldued lifting analysis and design of
all saddles and lifting aids.
|
|
Kaiser Engineers
|
Alcoa - Huntley Mine Site
|
Design audit of the new train load out bin at the Huntley Mine.
|
|
Kaiser Engineers
|
Alcoa - Point Comfort Texas - USA Calciner
|
Design audit of the new Calciner structure at the Point Comfort Plant. This
structure consisted of a 40m x 40m by 25m high steel framed structure carrying a
high temperature process vessel.
|
|
Lycopodium
|
Artic Platinum - Suhanko Finland
|
Preliminary design and MTO to be used in a bankable feasibility study.
|
|
Mermaid Marine
|
Simpson Field Development Project Western Australia.
|
Design of barge strengthening for the "Builder" barge to take a Manatowic 4100 crane
for pipe lay activities relating to the pipe pull at Varanus Island. Also
design of equipment bases and installation aids for the pipe installation works.
|
|
Mermaid Marine
|
Iron Ore Carrier Rescue - Karratha
|
Design of barge strengthening for the "Builder" barge to take a Mnatowic 4600 crane
to be used for unloading orde from grounded tanker.
|
|
Promet Engineers
|
Bootu Manganese Project - NT
|
Structural design of the primary crusher, screening plant, stockpile structures,
scrubber structure, surge bins, conveyors and earthworks.
|
|
Promet Engineers
|
OneSeteel magnetite Concentrator, Wyhalla SA
|
Design of all civil/structural works for the plant, including stockpile, conveyors,
screeening plant, HPGR crusher structrue, 750t surge bin, mill structure, thickeners,
tanks, pump bases and pipe racks.
|
|
Structural Integrity Engineering
|
Christmas Island Phosphate - Ship Loader Repair.
|
Design of the strengthening for the ship loader to meet increased environmental
loads.
|
|
Systems Mechanical
|
Dalgaranga Tantalum Project - Spirals Building and Screen Structure.
|
Design of extension to spirals building, including all steel and concrete works,
plus screen support structure.
|
|
Transfield
|
Collie Power Station - 600t Storage Diesel Tank
|
Design of 600t Diesel stroage tank for Clyde Hitachi Babcock project.
|
|
Tiwest
|
Cooljarloo, WA Dredge Analysis
|
Analysis of the main dredge with the aim of certifying for digging in heavier soil.
|
|
Tiwest
|
Cooljarloo, WA Cooljarloo Thickener
|
Check of existing steel thickener and foundations to carry loads fraom raising walls
of thickener. Also design all strengthening.
|
|
Tyco
|
Bayu Undan Project - Timor Sea
|
Design, fabrication support and lifting and transportation aids for the modules
relating to the fire fighting on the Bayu Undan Platforms.
|
|
US Filter
|
Murrin Murrin Nickel Project WA - Sulphuric Acid Plant
|
Conversion of a US design to suit Australian sections, connections and fabrication
methods.
|
|
Worley
|
Millenium Chemicals - Australind WA - Caustic Storage FBucklandities
|
Design of civil/structural content for new caustic storage fBucklandities, including
tanks, concrete slabs and bunds.
|