Past Projects

Client Project Description
Alcoa Hatch Engieering Alliance Alcoa Pinjarra Expansion - Calciner Project Design and documentation of entire structure, consisting approx 1000t of steel.
BHP Billiton DRI Port Hedland Furnace - FU411 Rebuild - Convection Coil Installation Frames. Design audit of installation frames for critical installation of convection coils into operating plant.
Clough Boroo Gold Project Mongolia Design audit for the leach and absorption areas.
Calibre Projects HI Yandi 36Mtpa - tertiary crusher structure. Design of the tertiary crushing sructure, including bins, bin support structure and general equipment support.
Como Engineers Megellan Lead Project WA Feasibility Study. Preliminary design for civil/structural works as part of bankable feasibility study.
DRA Pacific - Project Manager Ashton Mining - Merlin Project - Scrubber Vibration. Design of all civil works, concrete foundations and structural steelwork.
DRA Pacific Ashton mining - Merlin Project - Scrubber Vibration. Site investigation of remedial works to overcome severe vibration problems with elevated chain driven scrubber, designed by others.
Fleetwood Portables Woodside Phase 4 Expansions - Temporary Site Admin Offices Karratha Design of two level steel frame structure and transportable buildings for site office accommodation.
Fluor Batu Hijau Mine site for Newmont Indonesia. Design of all building works foundations and structural steelwork for the new heavy vehicle workshop - 300t vehicles and 2 no.35t SWL EOHT cranes, electrical workship and warehouse.
FEA Woodside Energy - North Rankin A Platform - Control Skid. Design of stainless steel closed cabinet and skid structure for installation offshore.  Design included consideration of cyclonic, lofting loads and sea transport loads.
GCD International Woodside Phase 4 Expansion - Chimney stacks - Karratha Structural design, fabrication support, transportation analysis and lifting analysis and design of 3 steel chimney stakcs of 40 metres height and ranging in diameter from 3.6 metres to 6.3 metres.
GDC International Woodside Phase 4 Expansion - Thermal Combustion Unit - Karratha. Structural design, fabrication support, transportation analysis and lifting analysis and design for a 40m high, 4 metre diameter TCU operating at a temperature of 1000 degrees celcius.  Responsibilities incldued lifting analysis and design of all saddles and lifting aids.
Kaiser Engineers Alcoa - Huntley Mine Site Design audit of the new train load out bin at the Huntley Mine.
Kaiser Engineers Alcoa - Point Comfort Texas - USA Calciner Design audit of the new Calciner structure at the Point Comfort Plant.  This structure consisted of a 40m x 40m by 25m high steel framed structure carrying a high temperature process vessel.
Lycopodium Artic Platinum - Suhanko Finland Preliminary design and MTO to be used in a bankable feasibility study.
Mermaid Marine Simpson Field Development Project Western Australia. Design of barge strengthening for the "Builder" barge to take a Manatowic 4100 crane for pipe lay activities relating to the pipe pull at Varanus Island.  Also design of equipment bases and installation aids for the pipe installation works.
Mermaid Marine Iron Ore Carrier Rescue - Karratha Design of barge strengthening for the "Builder" barge to take a Mnatowic 4600 crane to be used for unloading orde from grounded tanker.
Promet Engineers Bootu Manganese Project - NT Structural design of the primary crusher, screening plant, stockpile structures, scrubber structure, surge bins, conveyors and earthworks.
Promet Engineers OneSeteel magnetite Concentrator, Wyhalla SA Design of all civil/structural works for the plant, including stockpile, conveyors, screeening plant, HPGR crusher structrue, 750t surge bin, mill structure, thickeners, tanks, pump bases and pipe racks.
Structural Integrity Engineering Christmas Island Phosphate - Ship Loader Repair. Design of the strengthening for the ship loader to meet increased environmental loads.
Systems Mechanical Dalgaranga Tantalum Project - Spirals Building and Screen Structure. Design of extension to spirals building, including all steel and concrete works, plus screen support structure.
Transfield Collie Power Station - 600t Storage Diesel Tank Design of 600t Diesel stroage tank for Clyde Hitachi Babcock project.
Tiwest Cooljarloo, WA Dredge Analysis Analysis of the main dredge with the aim of certifying for digging in heavier soil.
Tiwest Cooljarloo, WA Cooljarloo Thickener Check of existing steel thickener and foundations to carry loads fraom raising walls of thickener.  Also design all strengthening.
Tyco Bayu Undan Project - Timor Sea Design, fabrication support and lifting and transportation aids for the modules relating to the fire fighting on the Bayu Undan Platforms.
US Filter Murrin Murrin Nickel Project WA - Sulphuric Acid Plant Conversion of a US design to suit Australian sections, connections and fabrication methods.
Worley Millenium Chemicals - Australind WA - Caustic Storage FBucklandities Design of civil/structural content for new caustic storage fBucklandities, including tanks, concrete slabs and bunds.
 